Error message

Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).

7

the complete idiots guide to cheese making

LINK 1 ENTER SITE >>> Download PDF
LINK 2 ENTER SITE >>> Download PDF

File Name:the complete idiots guide to cheese making.pdf
Size: 4134 KB
Type: PDF, ePub, eBook

Category: Book
Uploaded: 30 May 2019, 12:30 PM
Rating: 4.6/5 from 631 votes.

Status: AVAILABLE

Last checked: 3 Minutes ago!

In order to read or download the complete idiots guide to cheese making ebook, you need to create a FREE account.

Download Now!

eBook includes PDF, ePub and Kindle version

✔ Register a free 1 month Trial Account.

✔ Download as many books as you like (Personal use)

✔ Cancel the membership at any time if not satisfied.

✔ Join Over 80000 Happy Readers

the complete idiots guide to cheese makingADWEA Enclosures 42 - 43. F. Housing for Package SubstationCase studies. - Voltage Accessories. Case studies.. tations and the urban location of the substation. Scope of supply. DEWA has recently added a powerDEWA - Dubai Electricity. MEECO has an infrastructure that matches the size of its operations and its stature as the distributor.DEWA Substation, DIC College of IslamicDEWA, the first. Report this Document Download now Save Save DEWA Distribution Substation Guidelines Mar 2007 For Later 100 (2) 100 found this document useful (2 votes) 1K views 36 pages DEWA Distribution Substation Guidelines Mar 2007 Uploaded by majortay Full description Save Save DEWA Distribution Substation Guidelines Mar 2007 For Later 100 100 found this document useful, Mark this document as useful 0 0 found this document not useful, Mark this document as not useful Embed Share Print Download now Jump to Page You are on page 1 of 36 Search inside document Cancel anytime. Share this document Share or Embed Document Sharing Options Share on Facebook, opens a new window Share on Twitter, opens a new window Share on LinkedIn, opens a new window Share with Email, opens mail client Copy Text Footer menu Back to top About About Scribd Press Our blog Join our team. Quick navigation Home Books Audiobooks Documents, active. It is advised to check the latest requirements within DEWA Distribution Services Department before finalizing your design.5) For any Patrol station, no Pocket substation to be installed only regular substation should be install. Fixed aluminum louver window(s) should be located at 0.30m above outside level. 2-5) Cable arrangement: a) In case of cable trench arrangement, clear depth of 0.95m from FFL (finished floor level) of the Substation is to be provided.For cable maintenance minimum of 1.2m free space is to be provided towards of the cable tray (at least one side). Separate approval for location and size of LV room to be obtained from Consumer Services Department.http://a2kat.ru/userfiles/boss-gt-6-owners-manual.xml

    Tags:
  • the complete idiots guide to cheese making.

2-9) Wet areas (i.e. kitchen, bath, toilet etc.) above substation are not acceptable. Only in exceptional unavoidable cases, this may be accepted at the discretion of DEWA subject to complying with the following: a) b) c) d) 2-10) Annexure-1 (Regulation for wet area). Annexure-2 (Guarantee letter). Substation clear height is to be maintained no less than 3.66m from substation FFL up to the bottom of the attic slab. Our library is the biggest of these that have literally hundreds of thousands of different products represented. I get my most wanted eBook Many thanks If there is a survey it only takes 5 minutes, try any survey which works for you. Report this Document Download now Save Save 45078400 DEWA Sub Station For Later 0 ratings 0 found this document useful (0 votes) 9 views 18 pages DEWA Sub Station Original Title: 45078400 DEWA Sub Station Uploaded by Danish Nasim Description: DEWA Subst Full description Save Save 45078400 DEWA Sub Station For Later 0 0 found this document useful, Mark this document as useful 0 0 found this document not useful, Mark this document as not useful Embed Share Print Download now Jump to Page You are on page 1 of 18 Search inside document Cancel anytime. Share this document Share or Embed Document Sharing Options Share on Facebook, opens a new window Share on Twitter, opens a new window Share on LinkedIn, opens a new window Share with Email, opens mail client Copy Text Related Interests Transformer Electrical Substation Electric Power Power Engineering Manufactured Goods Footer menu Back to top About About Scribd Press Our blog Join our team.http://aceglobalventures.com/fck/boss-gt-6-manual-mode.xml Report this Document Download now Save Save Dewa Distribution Substation Guideline For Later 0 ratings 0 found this document useful (0 votes) 16 views 2 pages Dewa Distribution Substation Guideline Uploaded by Danish Nasim Description: Document Full description Save Save Dewa Distribution Substation Guideline For Later 0 0 found this document useful, Mark this document as useful 0 0 found this document not useful, Mark this document as not useful Embed Share Print Download now Jump to Page You are on page 1 of 2 Search inside document Cancel anytime. Share this document Share or Embed Document Sharing Options Share on Facebook, opens a new window Share on Twitter, opens a new window Share on LinkedIn, opens a new window Share with Email, opens mail client Copy Text Footer menu Back to top About About Scribd Press Our blog Join our team. Kevon Storie Jul 19, 2021 A significant part of Asset Management's mission is protecting Western Area Power Administration's (WAPA's) most important physical equipment. Power transformers, which convert voltage to different levels, rank high on that list. They also have one of the longest lead times to procure. A method for calculating a health index score for these assets is needed for many maintenance and investment decisions. One revealing factor in a transformer's health index score is the megavolt ampere, or MVA, that passes through the transformer. The more heavily loaded transformers tend to see a shorter lifespan than lightly loaded ones. Scattered across WAPA territory Although the connection between MVA load and asset health is relatively straightforward, getting this data from all of the transformers is anything but. The sheer quantity of data alone makes collection, storage, and analysis a daunting task. WAPA's supervisory control and data acquisition, or SCADA, system receives transformer data every 2 to 4 secs. It's not just a mountain but a mountain range of information.http://www.drupalitalia.org/node/77642 To complicate things further, WAPA's different regions have different SCADA systems and methods of storing the data. Asset Management does not have access to these systems and uses the Maximo record-keeping system as their data repository for holding health-index information. Despite the importance of these assets to system reliability, WAPA had no standard practice, routine, or tools for collecting and updating transformer MVA data. The Asset Management Program Initiation Project set out to collect that data in 2015 to calculate the first transformer health index scores, and the experience was eye opening. Maintenance had to request three years' worth of data from SCADA and that data had to be sifted and scrubbed to make sure the information correlated to the right equipment. As Bailey learned more about how the data was used, it became clear that the data-management practice was ripe for an overhaul. New tools change game Fortunately, the evolving technology landscape presented the opportunity. Asset Framework allowed data stored in PI Historian to be organized in more meaningful ways, such as adding asset identification data with devices used in the field. It also enabled PI Historian to store and calculate the near-constant data input in smaller chunks that could be transferred to Maximo more frequently. A pilot project was the next step to test whether or not these capabilities could be applied to transformer loading data. Testing through teamwork The Rocky Mountain and Desert Southwest regions were the first to build and deploy PI Asset Framework and send that data to WAPA's central PI system. This made the regions' transformer-loading data available for transferring from PI Historian to Maximo. The effort to create an automated process for linking data in PI Historian to assets in Maximo was launched in spring 2020.https://farandawaycycling.com/images/boss-gx700-service-manual.pdf Using RM and DSW transformers as the sample data, the proposed framework assigned identification numbers to assets that could be used across platforms. The pilot also established an integration between TIBCO and PI Asset Framework that ultimately enables PI data to be sent to systems such as Maximo. An interdisciplinary group came together in the spirit of collaboration to achieve that goal. Team members from IT, Asset Management specialists from Headquarters and the regions and subject matter experts on Maximo, PI Historian, and enterprise architecture all contributed to the project. Trended over time, this data will refine health index analytics and paint a more detailed picture of the condition and performance of critical assets in WAPA's fleet. Implementing central storage for data makes it more accessible and consistent in presentation. As it becomes easier across WAPA to locate and analyze information for business decisions, both short- and long-term users will gain greater appreciation for the value of real-time data. All rights reserved. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with Distribution Substation Guideline Dewa. To get started finding Distribution Substation Guideline Dewa, you are right to find our website which has a comprehensive collection of manuals listed. We have made it easy for you to find a PDF Ebooks without any digging. Our library is the biggest of these that have literally hundreds of thousands of different products represented. This is part of the authority’s strategy and its ongoing efforts to provide electricity and water services according to the highest standards of availability, reliability, and efficiency. This is done through specific and reliable planning processes that are based on the latest foresight tools and in accordance with international best practices.https://diagonal.org.ar/wp-content/plugins/formcraft/file-upload/server/content/files/1627306e04bbe7---briggs-and-stratton-5000-watt-generator-owners-manual.pdf Electricity infrastructure expansion plans, including increasing production capacity and transmission and distribution networks, are developed based on demand forecast in Dubai until 2030, taking into consideration the demographic and economic growth in the Emirate,” said Saeed Mohammed Al Tayer, managing director and chief executive of Dewa. All stations operate according to the highest standards of quality, efficiency, and safety using the latest digital technologies. Dewa achieved 100 per cent in all of the Getting Electricity indicators, including procedures; time; cost; and reliability of supply and transparency of tariff. Commercial and industrial customers can now get electricity connection up to 150kW within 5 days and in one step through Al Namoos, with security deposits and new connection charges waived. The UAE, represented by Dewa, has the shortest time in the world to get electricity according to the World Bank’s report. It is working to increase its use of clean and renewable energy, launch smart initiatives and adopt creativity and innovation in all its operations, Al Tayer further added. We will continue our efforts to support Dubai and the UAE.” DEWA also achieved the lowest customer minutes lost per year (CML) in the world of 2.39 CML compared to 15 minutes in Europe. The UAE, represented by DEWA, maintained its first place globally in getting electricity for the second consecutive year as per the World Bank’s Doing Business 2019 report, which measures the ease of doing business in 190 economies worldwide,” concluded Al Tayer. Is your mailbox full. Does your phone ring all the time. Do you want to get notified when the generator. Get in touch with Dubai Approvals Team to apply for the affiliation of Electricity and Water from DEWA Application and DEWA Approval services.We have a very professional and qualified team that helps you acquire DEWA approval for commercial as well as residential water and electricity requirements.AYNADAKIKEMALIZM.COM/resimler/files/comfortrac-cervical-traction-manual.pdf It is known as a public structure company that was founded on Jan 1, 1992. This company also covers billing, customer and supplier metrics, energy usage analysis, and production as well. So DEWA is known as a sole provider of electricity, sewerage, and water in Dubai. In April 2015, DEWA had established a capacity of 9,656 MW of electricity and 470 million gallons of desalinated water per day which has also a plan to increase this to over 10,000 MW by the year 2018. DEWA has also started to add solar power to boost up its energy. The latest start of DEWA’s solar plant has its capacity of 800 MW which will complete by the year 2020. DEWA also has a multidimensional plan of starting 250MW capacity pumped-storage hydroelectricity at Hatta place. DEWA has an enormous number of workforce (over 9,000 employees) for serving over 6,00,000 customers for electricity connection and 5,00,000 customers for water connection. Its objective is to provide world Class Customer Service. So by maintaining its motive it has developed its latest guidelines for Dubai Electricity and Water Customers for the NOC’s submission under DEWA approval. Following are the approvals provided by DEWA application: This application will be reviewed by the DEWA’s authority for giving confirmation of the DEWA Approval. Application service is fully free of cost while service is chargeable. This is also free of cost. This service for applying the application is free of cost but the service is chargeable. It requires you to submit many documents and can be a hassle for you. Our highly skilled professionals provide various other approvals too in Dubai. So, it becomes very important for Dubai authorities to manage and maintain a proper set of guidelines in order to maintain quality and safety in all the services. Trakhees has also set up various service codes, wherein every business has to follow certain rules and regulations in its operations.http://www.tenniscanberra.com.au/wp-content/plugins/formcraft/file-upload/server/content/files/1627306f326e29---briggs-and-stratton-5250-generator-manual.pdf So, in short, if you want to acquire any type of licensing service be it requesting a new license or make changes in your old license, your destination should be Trakhees. So, let’s discuss the procedure for various licensing approvals of Trakhees: Here are the steps to apply for a new license: For that, you need to submit the Name Reservation Form, Passport Copy of the local owner. If you are not a local owner, then your visa copy along with the passport is required. Make the payment, show the receipt and collect your Trade Name Certificate from the office. If you are a citizen of Iraq, Iran, Yemen, Somalia, Palestine, Morocco, Lebanon, Libya, Syria, Saint Kitts and Nevis, Saint Christopher and Nevis then the last six months bank statements are also required along with the Visa Copy. If your application has been accepted then you need to make the payment. It must be noted that the amendments which can be made are Changing Trade Name, Changing or Adding an Activity, Change in Address or Location, Changing or Appointing a Manager, Increase in Capital, Changing the Local Agent, Adding or Withdrawing a Partner, and Changing Legal Type. Also, each type of amendment procedure takes a certain amount of time. The printed license will be available to collect by the applicant. You can Contact Us and let our experts help you will all your license-related services. It has jurisdiction over all the city services and provides a tremendous amount of online services to residents as well as government sectors of Dubai. In 2001, Dubai Municipality Approval started its online service portal, wherein 40 city services were provided online in its initial phase. Today, almost all the services provided by the Dubai Municipality Approval or DM Approval can be accessed online. Being a resident of Dubai, or a businessman, it might be necessary for you to avail certain services every now and then.http://limpiasol.com/wp-content/plugins/formcraft/file-upload/server/content/files/1627306feb38e7---briggs-and-stratton-5000-watt-generator-manual.pdf But the question that arises is what type of services can you actually avail of depending on your requirement and category. In order to make it easy for you to understand, let’s list down all the services available to individuals and business sectors: Today, Dubai has become an international hub where people from all backgrounds are competing against each other. In order to cope up with the growing industrialization and infrastructure demand, it becomes very important to set a bar of standards for ensuring safety and security. The government of Dubai has handed over this responsibility to Trakhees. Moreover, you need to have a permit or approval for commencing the construction work. But the matter of fact is that sometimes the whole process of getting Trakhees approval can be a bit difficult if you have not followed the procedures properly. Let’s make it simple for you and discuss what you need to do so that you can get approvals easily: You must follow the given procedure in order to get Trakhees Approval: This design is then submitted online via e-permit to obtain a Building Permit application ID. A building permit fee notification will then be sent to your consultant and the specified payment is to be made. However, the documents and the application form are to submitted on a CD containing the documents in pdf format. If the CD contains all the documents as per the requirement, it is accepted and your consultant will receive a submission serial number sent through the mail. If the documents are not complete, Trakhees has the full right to reject your application. The Structural engineer will check your drawings and documents for the desired structural calculation. The architect will cross-check your drawings as per various applicable standards. The quality engineer will examine the drawings as per the quality guidelines, and thermal load calculations will be checked by an HVAC specialist.AYKUTEMLAK.COM/upload/ckfinder/files/comfortmaker-softsound-1000-manual.pdf Once all the engineers review the documents and drawings of your project, they will send a copy of their review to the Structural engineer who will then prepare a feedback summary report. This report will be then forwarded to the permit admin, who will then send the letter of Trakhees Approval to your Engineering consultant in Dubai. If the feedback summary report suggests any changes, then you will be required to resubmit your documents after making the specified changes. Permit admin will then prepare the NOC for the building permit and will attach all the recommendations to the permit. Your Engineering consultant in Dubai will be notified if any payment has to be settled by your side. The structural engineer and Sr. Manager Permits will sign the building permit. This CD will contain the building permit, signed drawings, and construction recommendations. It is important to comply with all the recommendations provided in the CD. They are as: They can be listed as: This permit is applicable to projects involving marine mammals. This permit is applicable to projects involving aquatic animals. After you fill-up the form, it is to be submitted to EHS Main Office Reception. You can also submit the application should e-mail. Remember to submit all the documents as mentioned in the form, or else your application will be rejected. You may also be required to submit some additional documents. No permit will be issued unless you do not make the payment. Below is the required amount of payment to be made for each type of permit: This will be followed by a surprise site inspection and the inspection reports will be released within five working days for Air Emission, seven working days for Irrigation, and eight working days for harbor water, from the date of inspection. You will then be required to submit the application along with the specified payment amount and a renewed permit will be issued to you. Let us help you with your Dubai Approvals procedures wherein our experts will help you anytime and anywhere so that you do not have to deal with the re-submission of your application. Not only that, but we also help you with DEWA approval, Dubai Municipality Approval, Jafza Approval, and approvals from many more authorities of Dubai. So, feel free to visit us and allow us to serve you for easy approvals. It provides municipal services to the population of Dubai and its work includes urban planning, construction supervision, environmental protection and improvement, public parks conservation, regulating and ensuring international quality standards compliance in aspects such as With a vision of “Developing a happy and sustainable city” the Dubai Municipality is also instrumental in maintaining the architectural heritage of the emirate by revival and maintenance of many cultural landmarks. One example of planning assistance is guidelines for the submission of a Master plan for building plan proposals. Here, the applier submits a draft proposal for preliminary assessment that covers ownership, on-site, and surrounding region description. Following this, a final assessment submission requires Non-Objection Certificates from the concerned local authorities (Dubai Police, Civil aviation, Road transport authority, Dubai Electricity and water authority, etc.) Finally, the DM provides a “sign off sheet” to all service authorities to get Dubai Municipality Approval for their master plan. This was primarily due to the disconnection of utility services to many residential, industrial, and commercial buildings as a result of illegal modifications, partitions, and additions that were made. Warning notices were first sent following which heavy fines were levied to discourage non-compliance. Repeated offenses meant that utility services to the offenders were cut through the Dubai Electricity and Water Authority - DEWA. Sometimes unauthorized changes to buildings also run the risk of lack of fire exits or basic health requirements and ambiance quality like lighting and ventilation. Once corrective action was taken, the services were restored to these locations. Obviously, it is!!! And the best part is that you can be a part of this experience. It can be regarded as a human psychology that once you experience something you feel is out of this world, you automatically go in a state of awe, and you start to complement the beauty. For instance, Burj Khalifa amazes everyone by the whopping height it is standing at, but no one compliments the efforts of various public bodies and authorities who worked day and night to make the project possible. Let’s take a look at how DEWA has been, and is, committed to making Dubai a place to live in luxury. The losses in power transmission and distribution as reported by DEWA are only 3.3 while the USA and UK have reported their number at 6-7. Also, the losses in water distribution are only 8 as compared to 15 in North America. These figures definitely prove DEWA to be a potential competitor in the global market. The expansion, once completed in 2018, will boost the current capacity to 2,760 MW in order to meet the requirements of Dubai. The project was launched in 2012 and its first phase was completed in October 2013 with a capacity of 13 MW. The second phase with a capacity of 200 MW was to be completed in April 2017 but because of the hard work and efficient management of DEWA, the plant was commissioned on 22 March 2017, ahead of the official commissioning date. With a total investment of about AED 50 billion, the plant will have a capacity to produce 1000 MW by 2020 and 5000 MW by 2050. DEWA is working on this initiative wherein they are planning to provide 7 of Dubai’s total energy from clean sources by 2020, 25 by 2030, and 75 by 2050. That means the majority of the energy used in Dubai will be from clean sources by 2050. The initiatives are the Shams Dubai initiative, The Smart Applications and Meters initiative, and the Green Charger initiative. Shams Dubai initiative focuses on builders to introduce the use of photovoltaic solar panels in order to generate electricity. The generated electricity can be used to meet the self-demand of the building and the excess electricity can be exported to DEWA. The Applications and Meters initiative promotes the efficient use of renewable energy. The Green Charger initiative focuses on Electric Vehicle Charging Stations (EVCS). In order to make this vision possible, DEWA has already allocated AED 3 billion to boost renewable energy projects, meet the highest international standards, and prove its excellence to the world. The Expo 2020 is set to open in October 2021 after the original opening schedule was canceled due to the pandemic. If you are looking to invest and set up your own projects, then Dubai should be your first option. You just need to get some approvals from various authorities in Dubai. Dubai Approvals will make it even easier for your DEWA Application. Our team will help you with a step-by-step process so that you can get DEWA Approvals for your projects in a short span of time and give wings to your vision. With new technologies and innovations being introduced every now and then, Dubai proudly holds the title of “The City of Future”. People from all around the globe come to Dubai to experience a better lifestyle but moving into Dubai was not that easy always. As Dubai was emerging as an international hub, it was attracting people from everywhere but the only problem was that foreigners were not allowed to buy properties. As most of the landmark locations in Dubai are masterpieces from EMAAR, so, let’s take a look at the 4 best engineering projects of EMAAR Dubai as of 2021: That single feeling can give you happiness and confidence for the entire day. The tallest building in the world as of 2021, Burj Khalifa, was inaugurated in January 2010. It is 829.8m tall with a total of 163 floors. The construction of Burj Khalifa has created a milestone in the history of the world as it gives out a loud message of how human capabilities have no boundaries. EMAAR Dubai had organized a naming competition for the fountain and the name “Dubai Fountain” was selected. It was inaugurated in May 2009 with a length of 902 ft and the capacity to shoot water up to 500 ft in the air. Located in the artificial Burj Khalifa Lake, it is equipped with 6600 lights and 25 colored projectors. When it is accompanied by musical beats, Dubai Fountain leaves you with heart-full of pleasure and amusement. It is the most visited building on the planet with an average of 54 million visitors every year. With an internal floor area of 5.9 million sq. ft., it is packed with 1200 shops, 22 cinema screens, 250 luxury hotel rooms, 120 eateries, and over 14000 parking spaces. In short, it has an entire world present in itself. It is an artificial canal city currently under construction. The construction of the Marina has been divided into phases with Phase 1 already been completed. When the construction will be completed, Dubai Marina will be the largest man-made marina in the world. It includes many landmark locations in itself such as The Dubai Marina Towers, Jumeirah Beach Residence, The Walk, Al Sahab, Al Majara, Marina Promenade, Marina Quays, Dubai Marina Mall, etc. Also, Emaar Community Management is the only organization outside the USA to become an Accredited Association Management Company providing professional association and community management services. Dubai Approvals team will provide you step by step information for getting approvals for your projects without any hindrance. Precautionary measures have been constantly provided by the government authorities to the city’s different sectors, including the construction industry. Recently the Dubai Development Authority, in coordination with the Dubai Civil Defence or DCD, has released a circular regarding Fire Safety during Construction that reminds and intensifies Fire and Life Safety requirements during Construction. DDA informs engineering consultants and contractors to be responsible for the effectiveness and implementation of the Fire and Life Safety Code of Practice during construction, modification, alteration, and demolition works. Along with this notice, Dubai Civil Defence also urges individuals, consultants, contractors, and organizations to commit themselves to the best possible practices in complying with the Fire and Life Safety Code of Practice in the UAE to avoid any possible fire disaster. Hot work, electrical installations, equipment works, and other activities under ignition sources must be performed through work permit procedure. The entire construction area must be indicated as a No Smoking area. Secure safety storage and handling of flammable and combustible materials away from ignition sources. Ensure to obtain DCD approval for bulk storage of flammable materials. Ensure safety Fire access road for Dubai Civil Defence approach, Means of Egress for evacuation, Fire Detection, and Alarm Systems and Fire Protection Systems. Consultants and contractors that fail to follow the requirements impost by the Dubai Development Authority may lead to the charging of applicable sanctions and penalties. The Construction requirements are to ensure Fire Safety in and around buildings and structures. Buildings are designed and constructed to provide safety from structural failure during a fire, provide protection to occupants from fire. Fire in one building and structure must be contained in its area origin to stop it from spreading to other areas, and do not spread to neighboring buildings or properties.