Error message

  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6489 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home1/dezafrac/public_html/ninethreefox/includes/common.inc).

7

fdot erosion and sediment control manual

LINK 1 ENTER SITE >>> Download PDF
LINK 2 ENTER SITE >>> Download PDF

File Name:fdot erosion and sediment control manual.pdf
Size: 1987 KB
Type: PDF, ePub, eBook

Category: Book
Uploaded: 28 May 2019, 14:25 PM
Rating: 4.6/5 from 726 votes.

Status: AVAILABLE

Last checked: 16 Minutes ago!

In order to read or download fdot erosion and sediment control manual ebook, you need to create a FREE account.

Download Now!

eBook includes PDF, ePub and Kindle version

✔ Register a free 1 month Trial Account.

✔ Download as many books as you like (Personal use)

✔ Cancel the membership at any time if not satisfied.

✔ Join Over 80000 Happy Readers

fdot erosion and sediment control manualThe goals of this program are to better educate installers and inspectors on proper Best Management Practice (BMP) selection, installation, layering, and maintenance; and to train and qualify inspectors to correctly inspect BMPs for use during and after construction so that impacts from uncontrolled erosion and sedimentation on the construction site are minimized. Upon the completion of the class, a proctored examination is administered and approximately 1 hour is given to complete the exam. In order to obtain the DEP qualification certificate, a minimum passing grade of 70 percent must be made on the exam. In 2018, the curriculum and training manual were divided into two tiers to cover material for installers and inspectors in sequence. To date, there are approximately 40,000 inspectors qualified under the educational program throughout the state of Florida. DEP-approved instructors voluntarily teach the installer and inspector training classes throughout the year. This allows the instructors flexibility to arrange classes around their schedules. The classes will help develop a better knowledge of how to properly manage the impacts from solids (TSS), turbidity (NTUs), and nutrients (i.e., nitrogen and phosphorus) and other surface water contaminates. Florida’s stormwater program is technology based, using performance standards and BMP design criteria. The use of innovative techniques and specifically designed erosion control systems are encouraged in order to prevent or limit erosion and sedimentation problems during and after land disturbance and construction activities. This class is a pre-requisite to the Tier II class. Upon the completion of the Tier II class, a proctored examination is administered, and a minimum passing grade of 70 percent must be made to obtain the DEP qualification certificate.http://cephedanismani.com/images/pages/engineering-mechanics-dynamics-solution-manual-bedford.xml

    Tags:
  • fdot erosion and sediment control manual, fdot erosion and sediment control manual, fdot erosion and sediment control manual, fdot erosion and sediment control manual pdf, fdot erosion and sediment control manual diagram, fdot erosion and sediment control manual system, fdot erosion and sediment control manual valve, fdot erosion and sediment control manual transfer switch, fdot erosion and sediment control manual instructions, fdot erosion and sediment control manual tile cutter, fdot erosion and sediment control manual process, fdot erosion and sediment control manual.

The vision of the Florida Department of Environmental Protection is to create strong community partnerships, safeguard Florida’s natural resources and enhance its ecosystems. Creole French German Italian Portuguese Spanish. If you do not want your E-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing. If you do not want your E-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing. These were published as a combined effort with the State Department of Environmental Protection. Notable contributors to the manuals were professionals from the State of Florida Water Management Districts, HydroDynamics Inc., the United States Geological Survey, the University of Central Florida (UCF), and various consultants. The Manuals are available on line at www.stormwater.ucf.edu. UCF conducted two training classes for FDOT personnel to both promote an understanding of the manuals and for future training upgrades. Researchers constructed an erosion control laboratory on the campus of UCF to review new products, develop and prove theories related to erosion control, and test existing products. They built two 8 ft by 30 ft test beds capable of variable slopes and water table depths. In addition, they constructed the world’s only rainfall simulator capable of rainfall rates of up to 12 in.The rainfall simulator and the test beds with an index testing area comprise the world’s largest erosion control and stormwater management facility of its type. Video of the simulator when in operation is available online at www.stormwater.ucf.edu. One application of the rainfall simulator and the test bed supported by this funding was to demonstrate the effectiveness of a silt fence.All Rights Reserved. Terms of Use and Privacy Statement.http://right-instinct.com/userfilesrightinstinct/engineering-mechanics-dynamics-solution-manual-6th.xml Compliance includes aquiring several local and federal permits. We can help meet those permit requirements with our erosion control products: Triton Type 1, 2, and 3 DOT Silt Curtains, Staked Turbidity Barriers, Coir Products, and Stormwater BMPs. These permits and products, along with knowledge of the state and federal water laws, are essential to avoid significant fines or project shut downs. So, what are these laws? Before this act was made law in 1972, runoff from stormwater was polluting many U.S. waterways with pesticides, oil, metals, fertilizers, bacteria and other pollutants.The permit mandates the use of Best Management Practices (BMPs) to prevent the spread of harmful pollutants into public waters. For more information about types of pollutants, please visit our Erosion Control Regulations and Resources page. The benefits of effective management and improved water quality include: protecting public health, flood control, water conservation, and the protection of environmentally-sensitive areas such as wetlands. It describes the overall strategy for erosion and sediment control, by detailing potential problems specific to the site and then suggesting concrete solutions. Contact Us The average 40-60 inches of annual rain that Florida receives increases the potential impact of contaminants entering waterways, making legislation even more vital. In 1982, Florida became the first state in the country to adopt a stormwater law (the State Stormwater Rule) which requires all new development to treat and prevent stormwater runoff using specifically designed BMPs. The permit regulates discharges of contaminants and stormwater into bodies of water from construction, industrial and municipal activity. The FDEP communicates the rules and regulations, issues the permits, manages applications and enforces the permits. That permit regulates stormwater quantity and quality and provides environmental protections.http://ninethreefox.com/?q=node/16523 It regulates any activity over water or alterations in water flow, dredging, and activities that include runoff. Just like the NPDES, the ERP is regulated by the FDEP. The state’s water management districts also have authority. Although it does not regulate, the FDOT follows CWA laws and provides its own measures to ensure that public roadways and waterways are kept clear, functional and safe. It also has specific guidelines for project materials that must be met for FDOT government contracts. Contact Us Many of these products are manufactured at our Florida-based site and are in stock and ready to ship. Our team can guide you in the right direction as to which products best meet your project’s needs. Three types are offered for varying wind and water conditions, and all three meet federal and Florida regulations. Contact Us Our product categories range from containment boom, turbidity curtains, dewatering bags, erosion control products, storage tanks, spill cleanup and containment, liners and covers, and stormwater construction BMPs. In addition, these otherSee the following section on design for sustainable,Visible structures get more attention. Add nitrogen fixingHow would someone know how much sediment hasConsider access roads, ramps toIf slope is higherIf steeper, explore other treatmentCan consider using gabion lining. Can vegetativeCommitments by municipalities must be madeLID employsBy reducingIt began with theSuch vegetation mustWhen it rains, bioretention areas collect the runoffLID site design attempts to minimize runoffGreater use of soil amendments increase the capacity ofExisting federally sponsored stormwater BMP manualPrepared by the Center for Watershed ProtectionSome of the best guidance for transportation agencies has beenThe Forest Service and U.S.Almost 30 percent of state DOTs have developedErosion and Sediment Control NPDES forField Manual for Erosion andThe reference for the field guide is the ODOT HydraulicIt includes stormwater treatment plan designAs manuals need to beA good manualIn this section,The manual needs to identify minimumThe manual should include aAn engineer can chooseThe performance criteria provide requiredThis section presents criteriaMany manuals do not incorporate credits,They should illustrateConstruction specifications detailThese checklists outlineNCHRP 25-25(01) isIn the late 1990s WSDOT and FDOT also developed systems. We apologize for the inconvenience. Please choose a different option. The email address format does not appear valid. Your emails do not match. Click OK to confirm your order. Click OK to confirm your order. Click OK to confirm your order. The CEP format should be something like 12345-678. Click OK to proceed without all the required information, or click Cancel to finish entering the missing data. Please try again with a different browser or device. Your name and email address have been added to the list of event attendees. Please enter a quantity of 1 or more next to the type or types of tickets you would like to purchase. Please enter a quantity of 1 or more next to the type or types of tickets you would like to purchase. Please choose a different date, time or number of tickets and place your order again. Try ordering again. How do I enable JavaScript on my computer? Please wait a few minutes and try again. Please try again. Please try again with only one browser tab open. Please try a smaller quantity. Please select a quantity and the best available seats will be assigned to you. Please make your event live to complete your order. Please try again. You have been logged out. Please try again later, or contact the organizer directly The email address format does not appear valid. Petersburg, Saint PetersburgPetersburg, Saint PetersburgPetersburg, Saint PetersburgPetersburg, Saint PetersburgPetersburg, Saint PetersburgPetersburg, Saint PetersburgPetersburg, Saint PetersburgPlease bring pens, highlighters and sticky notes. Log in or sign up for a free account to continue. If you do not want your E-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing. It can be obtained at the Adobe Company website. You will need AutoCAD or a similar product to open DWG files. AutoCAD is available at the Autodesk Company website:. The City is currently developing a procedure to make all documents posted ADA accessible. In the meantime, public records that are not currently accessible will not be posted to the City’s website but remain available pursuant to a public records request. To submit a public records request online visit MyJax or call (904) 630-CITY. All water mains, reclaimed water mains, sanitary sewer mains, and sewer pump stations shall be constructed in accordance with the latest JEA Water and Sewer Standards Manual. Click here to view the current JEA standards.Here is a link to download these fonts: Fonts.zip Utrench - Pavement Replacement Over Utility Trench DWG or PDF Visit our accessibility page for more information. If you wish to download it, please recommend it to your friends in any social system. Share buttons are a little bit lower. Thank you! Please wait. What’s in it for FDOT. What’s in it for Regulatory Agencies. Challenges A designer assuming an approach that a contractor may take to the construction of a project often leads to inefficiencies, overruns of planned erosion and sediment control items, and sometimes permit violations. There is a better way. Many FDOT projects do not have prescribed work phasing constraints which allows a contractor to select its most reasonable, practical approach to constructing the project. Including in these contracts Design plans for erosion and sediment control that are based on assumptions that may not be correct sets both the Department and the Contractor up for conflict. Design Build and Lump Sum contracting done in Florida have proven that this can be done successfully. Shared risk comes in form of FDOT responsible for providing information necessary for contractor to develop its plan. Paradigm shift is that contractors are typically given a fixed quantity of erosion and sediment control devices on which to base a bid. This approach would be lump sum with the contractor bidding the design of the plan as well as the installation and maintenance of the devices chosen to be used. This will require bidders to develop quantities and pricing for the erosion and sediment control devices it intends to use. With a choice of devices for the erosion and sediment control plan, a contractor could benefit from investing in products that have longer performance life. FDOT must make sure that its plans include the information necessary for the contractor to develop its plan. Some of the tools being provided are the Florida Erosion and Sediment Control Manual. This was developed to provide best practices for containing and managing erosion and sediment discharge. Mission The mission of the Governor's Center for Efficient Government is to promote fair and transparent best. Subcontracts Owner doesn’t “recognize” subcontractors They are representatives of the contractor Prime usually. To use this website, you must agree to our Privacy Policy, including cookie policy. Florida National Guard, state Law Employees who can work remotely may be Use the Solicitations Vendors can click Advertisements include the contactThe agency advertisement. Our innovative ability to design project-specific solutions in a timely and personal manner is a strength that our clients find useful. Our staff’s professional experience in traffic engineering and highway design is an important factor for repeat business.With over 29 years of experience, he has a strong background in highway design, ITS and traffic engineering. He has served as the engineer-of-record for traffic studies, plans, specifications and estimates for over a hundred transportation projects. These projects involved the analysis and design of pavements, traffic signal systems, ATMS applications, roadway lighting, highway signing, pavement marking, intersection improvement studies, and geometric design of highways. He provided technical support and advice regarding the work program to other sections within the District, the consulting industry and Contractors, along with recommendations for geometric improvements. As Project Director, Dilip is responsible for the quality, schedule and budget of all BES projects. A hands-on Principal of the firm, he leads his staff in the production of contract documents including plans and studies.Software experience includes FLOWMASTER, GEOPAK DRAINAGE, HEC-18, HEC-20, HEC-23, HEC-RAS, ICPR, PC-SWMM, and PONDS; Highway Capacity Software (HCS), Multi-Post Sign Program; MICROSOFT Project 2010, ORACLE Primavera (Earned Value Management, P6). His experience includes engineering of minor to major roadway projects that encompass a range of multi-disciplined tasks. He has a solid background in the design of rural and urban roadways, including horizontal and vertical geometry, super-elevation calculations, pavement design, signing and marking plans, quantities computations, cost estimates, and utility coordination. His software experience includes MicroStation, Geopak, Microsoft Office (Excel and Word), and Adobe Acrobat to create roadway plans, technical drawings and presentations. He creates practical solutions to design challenges, maintains quality standards in all work produced, and researches the feasibility of alternative design approaches. He has worked on teams analyzing transportation facilities, performing traffic studies and preparing inventories of civil infrastructure. He is currently working as the General Engineering Consultant (GEC) for FDOT District 7 Traffic Design. He has a thorough knowledge of electrical equipment and Control Systems Communications. As Engineer of Record for BES Inc. Electrical plans and calculations, Gopal reviews the electrical engineering aspects of roadway lighting and ITS Design. This includes verification of voltage drop calculations, sizing of load centers and circuits, and engineering feeder conductor sizes. He has served on a Hurricane Mitigation committee for Hillsborough County, Florida. He has co-authored Power Systems Protection Systems report for Gas Research Institute. Gopal has taught PE refresher courses under Institute of Electrical and Electronic Institute (IEEE). He has served as an Adjunct Instructor for Electrical Power Systems, University of South Florida, Tampa, Florida. Gopal has received more than 800 hours of technical training from GE, Siemens, Cooper, Progress Energy, Westinghouse, Bailey controls, Honeywell, and other well-known companies.As Drainage Engineer of Record, Tom has been responsible for numerous roadway drainage design projects.Troy has a strong background in Asphalt Production and Paving as his group was responsible for acceptance of all Roadway and Sidewalk projects in both Districts One and Seven while at the FDOT. He was District Bituminous Supervisor at FDOT from April 2013 to February 2019. He has provided roadway and bridge construction inspection services for various FDOT and municipal projects. Charles has been involved in roadway and bridge construction as follows: embankment, subgrade, base, asphalt paving operations, sub-soil excavation and documentation, MSE wall construction, substructure and superstructure construction, water and sewer line installation, storm sewer construction and installation, pre-cast and CIP box culverts construction and installation, sectional pipe lining, ARMI crack-relief layer, MOT operations, rip-rap rubble and slope pavement operations, signage and pavement markings, high-mast lighting, and overhead cantilever signage. He has a proficient understanding of engineering principles and procedures for transportation design and analysis. Charles is proficient with software that aids in the efficient design and production of roadway plans and traffic analysis. He is on track to get his Professional Engineering license in October 2020. JUSTIN R. RECK He has served as Project Manager on over a hundred transportation projects throughout FDOT District One. These projects involved the turn-lane projects, sidewalk construction, roadway lighting, highway signing, pavement marking, intersection improvements, and geometric design of highways. He has extensive Public Involvement experience including workshops and hearings, and he is experienced in production of Roadway, Signalization, Signing and Pavement Marking (SAPM), Lighting, and Maintenance of Traffic Plans. EVAN WOO He has a strong background in design and inspections. This position requires specialized skills in the realm of transportation design, mathematics, graphics, and computer technology. It includes, but is not limited to, analyzing field data, roadway design, sectional data, integrations with FDOT standards, and developing computer assisted drawings to document the work. She analyzed crash severity at traffic controlled intersections for her dissertation topic as a graduate research assistant, and applied her skills in calculating signal timings; building and calibrating models using CUBE software. She analyzed actual and optimal scenarios for intersections using SYNCHRO; compared interstate crash data using GIS software; and calculating Origin-Destination (O-D) matrix, number of lanes, and level of service (LOS) for freeways and multilane highways. She also designed a reinforced earth wall and a high embankment using HED software as part of her work as a research assistant, and as an engineering trainee she calculated reinforcement for pile and pile cap in a flyover project. She has research experience in the transportation field and knowledge of AASHTO geometric design and MUTCD, and she has experience managing projects. She has more than 40 years of computer and engineering experience in which she has accumulated knowledge in various aspects of structural and roadway design, plans production, CADD production management, and coordination. Before coming to FDOT, she prepared maintenance of traffic plans, sections, details, and quantities utilizing a variety of Design Standards, FDOT Plans Preparation Manual, CADD Production Criteria Handbook, Basis of Estimates, and associated spreadsheets and databases. She is able to perform Electronic Delivery according to FDOT standards. Karen is a certified MicroStation Cadd Manager and holds certifications in Erosion Control and Advanced MOT.He is responsible for keeping design staff current with up-to-date practices of the FDOT. He has implemented interoffice training by internet based seminars; presenting the most current Electronic Standards and GeoPak design software. Familiarity with multiple manuals including FDOT’s Design Standards, Basis of Estimates, CADD Production Criteria Handbook, CADD Manual, Construction Projects Administration Manual, Plans Preparation Manual, Standard Specifications and Guideline for Establishing Contract Duration, as well as the Manual of Uniform Traffic Control Design. Specialized experienced in “goes with” multiple projects for electronic delivery to the FDOT. Development of multifaceted Traffic Control Plans for complex urban reconstruction projects, interstate reconstruction projects, and rural projects including conceptual, geometric horizontal and vertical design, profiles, temporary drainage, plans preparation, quantity calculations, lane closure analyses, construction duration, quality control reviews and mentoring other team members.His strong design background includes a broad knowledge of traffic signalization plans, system interconnect and signing and marking plan development in accordance with Florida Department of Transportation (FDOT) guidelines. Extensive experience all areas of Construction Engineering Inspection (CEI) field inspector for the deployment and construction of traffic control devices and Intelligent Transportation Systems (ITS) devices. He is a certified IMSA Traffic Inspector and a Florida Intermediate Work Zone Specialist.She is adept at coordinating with local agencies, compiling project documentation and reports. She has prepared quantity calculations and cost estimates for numerous transportation projects as a Senior Specialist of BES Inc. She has performed investigative field reviews, prepared reports and cost estimates for these projects. She has over 20 years of administrative experience and 11 years of engineering experience.She has 15 years of experience handling all aspects of administrative coordination, with a special emphasis on editing and document preparation, and she is a registered Notary Public. Her skills in proofreading, fact-checking, and detail review are frequently applied in her support of engineering teams. Julie has used MicroStation to apply engineers’ markups, and she uses tools such as Microsoft Word, Excel, PowerPoint, and Access to organize data in complex ways. She assists with marketing, document editing, utility coordination, RCI data entry, and communication coordination. Her experience includes coordination with various government agencies and meeting clients’ and teaming partners’ needs in an efficient and timely manner. She also acts as a liaison between engineers, field personnel, and governmental agencies. She is familiar with some aspects of website design and publishing, and has many practical skills in using online media.Monaem’s prior practice includes marketing, pursuing projects, writing proposals, and leading and growing CEI Teams in his previous work positions. He worked with FDOT District Five for over 10 years, coming up through the ranks as DOT Inspector, Senior Inspector, Lead Inspector, then went to the admin side CSS, then to PA and PM during which time he developed the work program for one of its Operations Center. He has led the FDOT Construction and Maintenance groups, managed FDOT roadway and bridge projects, and supervised and managed Government and Consultant staff. His project experience includes road widening, bridge construction and rehabilitation, intelligent transportation systems (ITS), asphalt and concrete pavement, landscaping, drilled shafts and pile driving, cantilever and full truss installation, dynamic message signs (DMS), drainage improvement, trail and recreational parks, and utility projects. He worked on a variety of projects including lump sum (LS), plan quantity (PQ), pay item (PI), design-build (DB), Lap Projects (LP), and Joint Participation Agreement (JPA).3 Boundary Conditions The design and performance of an exfiltration trench system depends on the specific boundary conditions of the site, which are: the ground water elevation, the tailwater elevation if positive outfall and the allowable headwater Ground Water Elevation The ground water elevation to design exfiltration trench systems will be the high ground water table as defined in Section above Tailwater Elevation - 17- 22 The receiving water body defines the tailwater conditions for exfiltration trench systems with positive discharge. The design tailwater should be defined as per the latest FDOT Drainage Manual, Section Headwater Elevation The maximum allowable stage upstream of the exfiltration trench system will limit the design high water elevation. The drainage design in general should limit the design high water during the design storm event to meet the base clearance requirements and cause no adverse impact to the land use value of the surrounding properties. 3.4 Methodologies to Design Exfiltration Trenches There are several methodologies used to design exfiltration trench systems. All methods are similar in nature with specific criteria and requirements placed by regulatory agencies FDOT District Drainage Offices. As such, the methodology to be used in each specific project should be coordinated and previously approved by the District Drainage Engineer and the Permitting Authorities with jurisdiction over the area where the proposed drainage system will be installed. The equations and formulas included in the following sections present the conceptual development of the procedures and calculations, which is applicable with any unit system. As such, the conversion factors are not included, but the designer has to convert the units of each parameter as required to be consistent. In order to illustrate the calculation methods a sample roadway segment (Figure 3.4) with a contributing drainage area of 2.3 acres (including 0.8 acres of pavement) with on-line treatment will be used in the following Sections 3.4.1, and 23 3.4.1 Storage-Recovery Method This method is acceptable for the most of the permitting agencies and FDOT Districts because it provides the required water quality storage capacity within the exfiltration trench and assures that the treatment capacity will be available again within the required recovery time. The storage-recovery method is recommended for exfiltration trenches with bottom elevation, or at least the perforated pipe invert above the design ground water elevation. This method is not applicable if the top of the proposed exfiltration trench is below the design ground water elevation. As such, the required length of trench is 245 feet FDOT District VI Method The technical paper SUBSURFACE DRAINAGE WITH FRENCH DRAINS, prepared by the District VI Drainage Section on June 20, 1991 (Refer to Appendix A) includes criteria and procedures to design exfiltration trenches. This method is acceptable for projects within the FDOT District VI jurisdiction, mainly within Miami-Dade County, and other areas if approved by the permitting authorities. This method considers that there is no flow through the bottom of the trench (assuming that the bottom is the first portion of the trench to get clogged) but only through the vertical areas (walls) of the exfiltration trench. The hydraulic conductivity of the existing soils at the depth where the exfiltration trench will be located is considered to calculate the dimensions and required length of trench. A test procedure has been developed to determine the hydraulic conductivity (K) of the soils at different depths: The initial investigation includes soils from 0 to 10-foot depth; if the test hole exfiltration rate is less than 6 gpm then soils from 10-foot to 15-foot depth are investigated. If the accumulated exfiltration rate is still less than 6 gpm soils from 15-foot to 20-foot depth are investigated.